Key takeaways

  • Light foot traffic is often fine after a day or two
  • Cars are commonly kept off for about a week
  • Full design strength takes about twenty-eight days
  • Cold weather slows everything down

Concrete keeps getting stronger for weeks after it looks finished.

The first day

The slab sets and starts to harden. It needs protection from traffic, freezing and quick drying.

A few days in

Light foot traffic is often fine after a day or two, and furniture can wait a bit longer.

About a week

Many slabs can take cars after roughly a week, though heavy trucks should wait longer.

Twenty-eight days

This is the standard point where concrete reaches its design strength. Sealers and heavy loads often wait until then.

Use the planner

The Cure Time Planner on this site adjusts the timeline for temperature and slab thickness.

Related

Questions about your own project? Call or text 720-295-9670, or use the estimate form below.

Free estimate

Let's pour something solid.

Tell us what you want built or fixed. We read every message, seven days a week, and reply with clear next steps and a time for your free estimate.

  • The project: what you want built or fixed, where it is and the look you like
  • Your city, a rough size and any result you saved from a tool on this site
  • A detailed free estimate we put in writing, before anything begins
Prefer to talk? Call or text720-295-9670

Your estimate request

Prefer to type? Text your request. We only use your details to respond to your request.